Earthworks calculators
How far the ground has to come down (cut) or go up (fill) to reach finished level at each end of the length. Same all over? Put the same in both. If one end is cut and the other is fill, it works out where they meet.
Shrink: 1 m³ dug out of the ground ends up about 0.9 m³ once compacted as fill (10 %). Bulking and shrink are rules of thumb, so change them to suit your ground.
Depth is the finished, compacted thickness.
Typical extra: road base or fill 25–30 %, sand or crusher dust 15–20 %, topsoil or mulch 20 %, aggregate 5–10 %. Weights are loose and dry. These are rules of thumb, so change them to suit your supplier.
Queensland addresses. It loads the aerial photo, the lot boundary and the ground levels from the government's LiDAR survey.
Aerial photo, ground levels, addresses and boundaries © State of Queensland. Levels are a guide only. Check on site before you quote.
Row 1 is the front edge (nearest you in the 3D view). Column 1 is the left end.
The finished level is at the left end. A fall drops the pad towards the right end.