Earthworks calculators
Row 1 is the front edge. The first column is the left end. Type a level at every grid point.
The finished level is at the left end (first column). A fall makes the pad drop towards the right end, e.g. 1 % = 10 mm per metre.
Shrink means 1 m³ dug from the ground ends up as about 0.9 m³ once it's compacted in fill (at 10 %). These figures are rules of thumb, so change them to suit your ground.